MOQ and Lead Time for Sintered Stone Vanities: What 10 Sets and 15 Working Days Mean
“How many sets do I have to order, and how soon can they arrive?” Two questions shape a first inquiry a vanity buyer sends, and the answers decide whether a supplier fits the project.
This guide answers those questions with the factory’s own terms: MOQ 10 sets, delivery in 15 working days, sampling in 7–20 working days. It explains what each number covers, what pushes the sample window toward either end, and what to send so a sample starts without a round of clarification emails. The figures are quoted factory terms — confirm the start and end points of each window in writing before you plan around them.
By Vora Surfaces Factory Editorial Team · Published 2026-10-18 · Foshan, China
In short: MOQ is 10 sets. Delivery runs 15 working days. Sampling runs 7–20 working days depending on process complexity, and sampling needs drawings, material requirements, and packaging requirements. Confirm the start and end points of each window in writing before you plan around them.
The three numbers, up front
| Term | Factory figure | What to confirm in writing |
|---|---|---|
| Minimum order quantity | 10 sets | Whether the 10 sets can mix models, widths, and finishes |
| Delivery | 15 working days | When the clock starts and what the window covers |
| Sampling | 7–20 working days | What drives your sample toward the short or long end |
Those three lines carry the whole conversation. The rest of this guide unpacks each one.
What 10 sets means in practice
MOQ 10 sets sets the floor for an order: ten complete vanity sets. That floor suits buyers who want to test a line in a showroom, furnish a small project, or place a first order before committing to larger volumes.
The catalogue behind that floor covers about 40 models, with common widths from 60 to 120 cm. Custom orders are supported, including non-standard sizes such as extra-wide 72”+ double-basin configurations. Cabinet bodies are moisture-proof solid wood, mirrors are LED with touch control and optional anti-fog, and hardware is Kubo/DTC or equivalent grade. Hot-bending runs in-house, which keeps the whole unit under one roof from sample through production.
One question shapes how you use the MOQ: can the 10 sets mix models, widths, and finishes, or do they need to share one specification? A buyer who can mix might split 10 sets across two widths for a showroom display. Ask the question early, in writing, and build the order around the answer — including whether a mirror upgrade or a cabinet-front variation counts toward the same 10 sets.
A 10-set order is small enough to fit a showroom test or a single project, and large enough to run as a proper batch: in general, factories set a floor because setup work is spread across a batch (general knowledge, not a factory-specific claim). Buyers who want fewer than 10 sets should still ask: the factory’s answer may point to a concept collection piece or a custom configuration that fits the project, or it may confirm that 10 sets is the floor for a production run.
What 15 working days means in practice
Delivery runs 15 working days. Working days exclude weekends and public holidays, so 15 working days spans roughly three working weeks, or about 21 calendar days before holiday adjustments. Count working days when converting the figure to a calendar date, and check which public holidays fall inside the window.
The more important question is when the clock starts. A delivery window has a start point and an end point, and both deserve written confirmation — the start might be order confirmation or specification sign-off, and the end might be factory departure or arrival at a named handover point. Those points vary by order. Get them in the order paperwork, in plain words, before you plan an install date around the 15 working days.
Plan backwards from the install date, and leave room for the steps that follow delivery: receiving inspection, installation scheduling, plumber availability, room preparation. A buyer who plans the install for the day after the delivery window closes leaves no room for any of those steps. Leave a buffer of a few working days between delivery and install.
For buyers comparing suppliers, the 15-working-day figure sets a comparison point. Ask every supplier the same two questions — when does the clock start, and what does the window cover — and compare the answers on equal terms. The buyer page collects the factory’s terms in one place for that comparison.
Sampling: why 7–20 working days is a range
Sampling runs 7–20 working days, depending on process complexity. Ask the factory in writing what counts as complex for your sample — do not assume a catalogue repeat lands at the short end. The range reflects the work.
Basin shape and size. Hot-bending runs in-house, which keeps shaping under the same roof as assembly and packing. A catalogue basin in a common width repeats known work. The factory supports custom orders, including extra-wide 72”+ double-basin configurations and other non-standard sizes. If your sample involves a custom basin, ask the factory in writing how it affects your sample window.
Cabinet front. The factory can produce CNC fluted (grooved) cabinet fronts. If you want a fluted look, name it in the material requirements and ask whether it affects your sample window. Buyers who want a fluted look should name it in the material requirements, so the sample reflects the real front.
Packaging requirements. Packaging requirements are one of the three required inputs for a sample. Send them with the request, so the sample is packed to your requirements. A sample packed to a buyer’s own channel requirements — crate marking, pallet format, label layout — needs those requirements confirmed before packing. Send them with the sample request, and ask the factory to confirm the sample packing in writing.
The 7–20 day range has a reason, and the reason is visible in the request itself. Do not estimate your sample window from the number of custom elements; confirm your sample window with the factory in writing.
What to send so the first sample counts
Sampling needs three things: drawings, material requirements, and packaging requirements. Send all three with the first request, and the sample starts clean. Each missing item stalls the work in its own way.
Drawings. Drawings carry the dimensions the factory builds to: overall width and depth, basin layout, tap-hole positions, mounting type. A drawing with tap-hole positions lets the factory drill the basin to match the buyer’s taps — basins leave the factory with tap holes pre-drilled for mainstream mixer tap specs, with hole sizing confirmed at order time. If the drawing omits tap-hole positions, ask the factory in writing how it handles the missing positions before production. A hole in the wrong place cannot move after the stone is cut.
Material requirements. Material requirements name what the sample is made of: the slab look and finish, the cabinet finish, the mirror type, the hardware grade. A clear list lets the factory build the sample to match the production unit. A vague note — “white basin, wood cabinet” — leaves the factory choosing among options the buyer may not want.
Packaging requirements. Packaging requirements describe how the sample should travel: crate type, internal protection, marking, pallet needs, and any label layout the buyer’s channel requires. Foam wrap plus a wooden crate with internal framing holds the load rigid in transit, and the factory packs production units that way. Send a particular pallet size or label format with the sample request, so the sample tests the packing you specified. Without packaging requirements, the sample ships without packing matched to the buyer’s handling.
A short checklist covers the request:
- Drawings: width, depth, basin layout, tap-hole positions and sizing, mounting type, tolerances
- Material requirements: slab look and finish, cabinet finish, mirror type and anti-fog, hardware grade
- Packaging requirements: crate and protection expectations, marking, pallet and label needs
How packing and a tape measure back the delivery window
A delivery promise rests on what happens before the crate closes. Each basin travels foam-wrapped in a wooden crate with internal wooden framing and strapping: the foam cushions the stone, the framing holds the load rigid, and the strapping keeps the unit from shifting. Ask the factory to confirm the packing for your sample and your production order in writing.
Before packing, each basin top gets a tape-measure check (photo evidence). Confirm with the factory which dimensions the check covers. It catches the mismatch that matters most — a unit built to the wrong dimension — while the crate is still open and the fix is still cheap. An error found after delivery costs far more: a return, a remake, and a missed install date.
The check and the packing work together: the check confirms the unit matches the order, and the packing protects the unit that passed the check. Ask for the same pairing on your own order, and confirm it in the order paperwork.
The same logic applies to the buyer’s side. When the order arrives, measure the finished unit against the order sheet before signing the delivery note. Width, depth, and basin-center positions confirm the right unit arrived.
Putting the timeline together
A buyer who samples before ordering plans two windows back to back: a sample window of 7–20 working days, then a delivery window of 15 working days. A 7-working-day sample plus 15-day delivery is 22 working days; a 20-day sample plus 15-day delivery is 35 working days before the steps that follow delivery. That arithmetic is a planning illustration; the real total depends on the sample’s complexity, the confirmation points in the order paperwork, and the buffer left for inspection and install.
Keep the timeline honest by confirming the start and end points of each window in writing before counting dates, sending the full sample checklist with the first request, and leaving a buffer between delivery and install sized to the project’s tolerance for a late day.
Buyers who already know the specification can narrow width, basin layout, and hole positions in the configurator before the first inquiry. Buyers still weighing the line can read the hot-bent basin page for the shaping process behind the product. Both paths end at the same next step — a written specification, a confirmed window, and a sample or order built to it.
Frequently asked questions
What is the minimum order quantity for a sintered stone vanity?
10 sets. Confirm with the factory whether the 10 sets can mix models, widths, and finishes, or need to share one specification, since that detail shapes how you build the order.
How long does delivery take?
15 working days. Confirm the start point and the end point of that window in writing before you plan an install date around it.
How long does sampling take?
7–20 working days, depending on process complexity. Sampling needs drawings, material requirements, and packaging requirements.
What do I need to send to start a sample?
Drawings, material requirements, and packaging requirements. A missing item stalls the sample, since the factory cannot confirm dimensions, materials, or packing without it.
Ask about MOQ and lead time for your project
Tell us the widths, basin layout, and quantities you have in mind, and ask for written confirmation of the MOQ, the delivery window, and the sample window for your specification. See the buyer terms for the factory’s terms in one place, or configure your spec.
When you send an inquiry, Roy Wu replies. Your details are used for this inquiry only: no mailing list, no bulk follow-ups.
Specifications verified against Vora Surfaces factory records. Editorial review applied. Spotted an error? Email corrections to vorasurfaces@gmail.com.
Frequently asked questions
What is the minimum order quantity for a sintered stone vanity?
10 sets. Confirm with the factory whether the 10 sets can mix models, widths, and finishes, or need to share one specification, since that detail shapes how you build the order.
How long does delivery take?
15 working days. Confirm the start point and the end point of that window in writing before you plan an install date around it.
How long does sampling take?
7–20 working days, depending on process complexity. Sampling needs drawings, material requirements, and packaging requirements.
What do I need to send to start a sample?
Drawings, material requirements, and packaging requirements. A missing item stalls the sample, since the factory cannot confirm dimensions, materials, or packing without it.
Sourcing hot-bent basins for your next project?
Send your drawings and target quantities — we'll confirm feasibility from the factory floor.
Configure your inquirySee the products behind these guides: production cabinet styles and buying terms for buyers & OEM.
Specifications verified against Vora Surfaces factory records. Editorial review applied. Spotted an error? Email corrections to vorasurfaces@gmail.com.